Tame the Beast! System Cabling for Control Systems Made Easy

June 1, 2022

 

{youtube}uM1vhOjQQoQ{/youtube} 

 

The wiring of modern control systems is becoming increasingly complex and more laborious. And on top of this, conventional point-to-point wiring of sensors and actuators in the field is also time-consuming and prone to error. With an efficient system cabling solution, you can enjoy 95 percent quicker and more compact wiring of your field components while also ensuring increased safety. Discover the potential of our cabling solutions and benefit from our wide selection of pre-assembled cables.

 

Read more by clicking here 

Related Articles



Editor’s Pick: Featured Article

Weidmüller’s u-control 2000: The Automation Controller

Weidmüller’s u-control 2000: The Automation Controller

Weidmüller’s scalable engineering software, u-control 2000, adapts individually to your requirements. And, the u-control is powerful, compact and fully compatible with Weidmüller’s I/O system u-remote. This article looks at what makes u-control the heart of your automation.

Programmable logic controllers (PLCs) are one of the main components of any automated system. A typical control system has inputs, outputs, controllers (i.e., PLCs), and some type of human interaction with the system, a human machine interface (HMI), for example.

Read More



Latest Articles

  • NVIDIA 800 VDC Architecture Will Power the Next Generation of AI Factories

    November 4, 2025 By Mathias Blake, Martin Hsu, Ivan Goldwasser, Harry Petty and Jared Huntington The exponential growth of AI workloads is increasing data centre power demands. Traditional 54 V in-rack power distribution, designed for kilowatt (KW)-scale racks, isn’t designed to support the megawatt (MW)-scale racks coming soon to modern AI factories.  NVIDIA is leading the transition to 800 VDC data… Read More…

  • Efficient Power Monitoring at the Edge: Moxa’s DCI Solutions for Data Centres

    November 4, 2025 As data centres grow in higher densities to support AI-enabled workloads and more complicated operations, keeping the Power Usage Effectiveness (PUE) at optimum is critical at this time. Downtime is never acceptable. Also, without being able to see electrical systems in real-time, such as substations, UPS, switchgear, and HVAC, failures will take… Read More…