Hammond Manufacturing: Type 1 Galvanized Lay-In Wireway CWG Series

DCS Hammond Type 1 Lay in Wireway CWG Series 1 400x275

November 23, 2022

 

Application  

  • •Construction designed to ensure electrical continuity and to permit fast and easy indoor installation of multiple wireway runs.

 

Standards  

  • •UL-50 Type 1
  • •cUL Type 1
  • •Complies with
    • •IEC 60529, IP20

 

Construction  

  • •Formed from 16 or 14 gauge unpainted G90 galvanized steel
  • •Flat covers have keyhole screw slots
  • •Straight sections are offered with/without adequate concentric knockouts (1/2″, 3/4″ conduit size)
  • •Unobstructed interior speeds up laying of cables
  • •Optional hanger brackets allow for vertical or horizontal mounting
  • •Joiners sold separately

 

Finish

  • •Sections, components, and couplings are unpainted galvanized

 

To learn more about the Type 1 Galvanized Lay-In Wireway CWG Series from Hammond Manufacturing, click here 

 

Hammond Manufacturing Logo 300x150

 

 

 

 

Related Articles



Editor’s Pick: Featured Article

Weidmüller’s u-control 2000: The Automation Controller

Weidmüller’s u-control 2000: The Automation Controller

Weidmüller’s scalable engineering software, u-control 2000, adapts individually to your requirements. And, the u-control is powerful, compact and fully compatible with Weidmüller’s I/O system u-remote. This article looks at what makes u-control the heart of your automation.

Programmable logic controllers (PLCs) are one of the main components of any automated system. A typical control system has inputs, outputs, controllers (i.e., PLCs), and some type of human interaction with the system, a human machine interface (HMI), for example.

Read More



Latest Articles

  • Why Use Low-Consumption Contactors in Your Motor Control Systems?

    April 15, 2025 By Tiffany Moore Organizations are under more pressure than ever to improve sustainability metrics. How can you help them succeed — and win more business in the process?    Building motor control systems with more sustainable parts is one piece of the puzzle. Control panel builders, system integrators, and design firms have an… Read More…

  • The Long Cable Run Dilemma: Where Should You Install the VFD?

    April 15, 2025 By Damien Herwegh Sophia, a dedicated electrical engineer in a large industrial complex, has been tasked with installing a drive system where the motor is located hundreds of meters away from the control room. Like many engineers before her, she considers the usual question: Should I place the drive in the electrical… Read More…