Ballard Receives Order from Siemens Mobility to Power 7 Trains and Signs LOI for Up to An Additional 200 Modules Over the Next Six Years

DCS Ballard Receives Order from Siemens Mobility to power 7 Trains and LOI for up to 22 Modules 1 400x275

October 11, 2022

 

Ballard Power Systems recently announced an order for 14 x 200 kW fuel cell modules from Siemens Mobility GmbH (“Siemens Mobility”; www.mobility.siemens.com), a leading supplier in the development of alternative drives, to power a fleet of seven Mireo Plus H passenger trains. Delivery of the 14 fuel cell modules is expected to start in 2023 with the fleet planned to be in service in Berlin-Brandenburg region in late 2024.

In addition to the initial order of 14 fuel cell modules, Siemens Mobility also signed a letter of intent with Ballard for the supply of 200 fuel cell modules totaling 40 MW over the next six years, including a firm commitment on 100 of the fuel cell modules totaling 20MW. The modules will be used for Siemen’s Mireo Plus H trains.

“This is a significant milestone for our multi-year collaboration efforts with Siemens Mobility and the future of zero-emission commuter rail in Europe. Our fuel cell technology is an ideal solution to support the heavy payload, long range and rapid refueling requirements of Siemen Mobility’s passenger train fleet. We look forward to our continued collaboration and are excited for the opportunity to support the Berlin and Brandenburg region’s first hydrogen powered rail network,” said David Mucciacciaro, Ballard Chief Commercial Officer. “We will continue our work to secure platform wins with key partners in our core verticals and to support their scaling plans to achieve decarbonization.”

“We can only meet climate change targets by increasing rail transportation. Our first order for a fleet of hydrogen-powered trains will enable emission-free rail transport on non-electrified routes in Germany,” said Jochen Steinbauer, Platform Director H2 Technologies at Siemens Mobility. “Our Mireo Plus H is a next-generation hydrogen train, featuring longer range, faster acceleration and state-of-the-art technologies, setting new standards in zero-emission passenger transport.”

 

Source

 

Related Articles



Editor’s Pick: Featured Article

Weidmüller’s u-control 2000: The Automation Controller

Weidmüller’s u-control 2000: The Automation Controller

Weidmüller’s scalable engineering software, u-control 2000, adapts individually to your requirements. And, the u-control is powerful, compact and fully compatible with Weidmüller’s I/O system u-remote. This article looks at what makes u-control the heart of your automation.

Programmable logic controllers (PLCs) are one of the main components of any automated system. A typical control system has inputs, outputs, controllers (i.e., PLCs), and some type of human interaction with the system, a human machine interface (HMI), for example.

Read More



Latest Articles

  • Why Use Low-Consumption Contactors in Your Motor Control Systems?

    April 15, 2025 By Tiffany Moore Organizations are under more pressure than ever to improve sustainability metrics. How can you help them succeed — and win more business in the process?    Building motor control systems with more sustainable parts is one piece of the puzzle. Control panel builders, system integrators, and design firms have an… Read More…

  • The Long Cable Run Dilemma: Where Should You Install the VFD?

    April 15, 2025 By Damien Herwegh Sophia, a dedicated electrical engineer in a large industrial complex, has been tasked with installing a drive system where the motor is located hundreds of meters away from the control room. Like many engineers before her, she considers the usual question: Should I place the drive in the electrical… Read More…