Siemens Canada Limited and Stellar Power & Control Solutions LP. enter a Siemens Solutions Partner Automation Drives Agreement

PBSI DCS StellarPCS Siemens 400

February 8, 2019

Stellar Power & Control Solutions LP. has been selected as a Global Partner and only the second General Motion Control Partner in Canada.

Located in Western Canadian, Stellar Power & Control Solutions is an Electrical Systems Integrator specializing in the design and build of Pump and Motor Control Panels, mainly within Municipalities and Mining and Forestry.

The Siemens Solutions Partnership agreement comes at an exciting time, as Siemens has released their new series low voltage VFD G120X for Fan, Pump, Water and Waste Water applications. The G120X is an instant star, as it completes the power range for Siemens VFD in Canada and enhances the competition for the customer.

“This strategic partnership is born out of the mutual respect for product quality and excellent customer service.” said Glen Follett, Vice President, Stellar Power & Control Solutions LP.

Go HERE to learn more about Stellar Power & Control Solutions.

Related Articles



Editor’s Pick: Featured Article

Weidmüller’s u-control 2000: The Automation Controller

Weidmüller’s u-control 2000: The Automation Controller

Weidmüller’s scalable engineering software, u-control 2000, adapts individually to your requirements. And, the u-control is powerful, compact and fully compatible with Weidmüller’s I/O system u-remote. This article looks at what makes u-control the heart of your automation.

Programmable logic controllers (PLCs) are one of the main components of any automated system. A typical control system has inputs, outputs, controllers (i.e., PLCs), and some type of human interaction with the system, a human machine interface (HMI), for example.

Read More



Latest Articles

  • Why Use Low-Consumption Contactors in Your Motor Control Systems?

    April 15, 2025 By Tiffany Moore Organizations are under more pressure than ever to improve sustainability metrics. How can you help them succeed — and win more business in the process?    Building motor control systems with more sustainable parts is one piece of the puzzle. Control panel builders, system integrators, and design firms have an… Read More…

  • The Long Cable Run Dilemma: Where Should You Install the VFD?

    April 15, 2025 By Damien Herwegh Sophia, a dedicated electrical engineer in a large industrial complex, has been tasked with installing a drive system where the motor is located hundreds of meters away from the control room. Like many engineers before her, she considers the usual question: Should I place the drive in the electrical… Read More…