Pilz Canada cuts the Ribbon at New Canadian Facility

PB DCS CEW OPG headquarters 400

June 13, 2019

Pilz Canada officially opened their Canadian Facility surrounded by Industry Partners, colleagues and channel partners.

The facility located in Mississauga Ontario represents the next stage of the Pilz’s family Investment into the Canadian Market. The new facility boasts a training facility and Laboratory.

Pilz is a leader in safe automation technology and is known Internationally as a total solutions supplier with solutions for safety and automation technology.

The objective of Pilz is to automate machines and plants in such a way that the safety of man, machine and environment is always guaranteed.

Go HERE for more information on Pilz

Related Articles



Editor’s Pick: Featured Article

Weidmüller’s u-control 2000: The Automation Controller

Weidmüller’s u-control 2000: The Automation Controller

Weidmüller’s scalable engineering software, u-control 2000, adapts individually to your requirements. And, the u-control is powerful, compact and fully compatible with Weidmüller’s I/O system u-remote. This article looks at what makes u-control the heart of your automation.

Programmable logic controllers (PLCs) are one of the main components of any automated system. A typical control system has inputs, outputs, controllers (i.e., PLCs), and some type of human interaction with the system, a human machine interface (HMI), for example.

Read More



Latest Articles

  • Why Use Low-Consumption Contactors in Your Motor Control Systems?

    April 15, 2025 By Tiffany Moore Organizations are under more pressure than ever to improve sustainability metrics. How can you help them succeed — and win more business in the process?    Building motor control systems with more sustainable parts is one piece of the puzzle. Control panel builders, system integrators, and design firms have an… Read More…

  • The Long Cable Run Dilemma: Where Should You Install the VFD?

    April 15, 2025 By Damien Herwegh Sophia, a dedicated electrical engineer in a large industrial complex, has been tasked with installing a drive system where the motor is located hundreds of meters away from the control room. Like many engineers before her, she considers the usual question: Should I place the drive in the electrical… Read More…