New All-Electric Niagara Falls Tour Ferries Powered by ABB Enter Service

October 6, 2020

Tour boat passengers will be able to experience one of the wonders of the natural world undisturbed by exhaust fumes, engine noise or vibrations, after a pair of vessels installed with all-electric propulsion from ABB have been approved to enter service on October 6, 2020.

The zero-emission ferries – named the James V. Glynn and the Nikola Tesla, respectively in honor of the Maid of the Mist chairman and the renowned energy pioneer – are the first all-electric vessels built in the US, with power drawn from a high-capacity battery pack supplied and integrated by ABB. In addition to batteries, ABB has supplied a comprehensive integrated power and propulsion solution for the newbuild vessels, including an onshore charging system, enabling sustainable operation with maximum reliability.

“Maid of the Mist has always evolved with the technology, and we are thrilled to open a new page in our company’s history, moving our fleet to zero-emission operation,” said Christopher M. Glynn, President of Maid of the Mist Corp. “Close collaboration with ABB has been instrumental in making this project a success, and we are proud of what we were able to accomplish together.”

{videobox}NJIRY9hP75M{/videobox}

“As well as allowing passengers to enjoy the spectacular experience of Niagara Falls and safeguarding the environment, the vessels confirm growing acceptance of all-electric vessel propulsion,” said Juha Koskela, ABB Marine & Ports Division President. “We applaud Maid of the Mist’s decision to move to zero-emission operation and are honored to have worked with this forward-thinking company on implementing the electric power and propulsion solution.”

James V. Glynn and Nikola Tesla are each powered by a pair of battery packs providing 316 kWh total capacity divided across two catamaran hulls, offering a level of redundancy that helps to safeguard operations. The batteries allow the electric propulsion motors to reach an output of up to 400 kW, with the power setup controlled by ABB’s Power and Energy Management System. They are charged using locally produced hydroelectricity – ensuring that the energy cycle for the operation of the Maid of the Mist ferries is entirely emissions free – in a process that takes just seven minutes during disembarkation and boarding.

Having installed the ship-to-shore battery charging connection, ABB also supplied the Glynn and the Tesla with a comprehensive scope of electric, digital and connected solutions including switchboards, drives and the integrated control system, in addition to the ABB Ability™ Marine Remote Diagnostic System for monitoring and predictive maintenance.

Source

Related Articles



Editor’s Pick: Featured Article

Weidmüller’s u-control 2000: The Automation Controller

Weidmüller’s u-control 2000: The Automation Controller

Weidmüller’s scalable engineering software, u-control 2000, adapts individually to your requirements. And, the u-control is powerful, compact and fully compatible with Weidmüller’s I/O system u-remote. This article looks at what makes u-control the heart of your automation.

Programmable logic controllers (PLCs) are one of the main components of any automated system. A typical control system has inputs, outputs, controllers (i.e., PLCs), and some type of human interaction with the system, a human machine interface (HMI), for example.

Read More



Latest Articles

  • Why Use Low-Consumption Contactors in Your Motor Control Systems?

    April 15, 2025 By Tiffany Moore Organizations are under more pressure than ever to improve sustainability metrics. How can you help them succeed — and win more business in the process?    Building motor control systems with more sustainable parts is one piece of the puzzle. Control panel builders, system integrators, and design firms have an… Read More…

  • The Long Cable Run Dilemma: Where Should You Install the VFD?

    April 15, 2025 By Damien Herwegh Sophia, a dedicated electrical engineer in a large industrial complex, has been tasked with installing a drive system where the motor is located hundreds of meters away from the control room. Like many engineers before her, she considers the usual question: Should I place the drive in the electrical… Read More…