EDGE Automation Has a New Home

EdgeAutomationNewPlant

July 28, 2020

Edge Automation has a new home at 363 Sovereign Road, with all of their design, production, programming, machining and assembly under one roof! This move allows for easier communication between departments, furthering their ability to bring you the best quality product possible from concept, to design, to finished product.

This state of the art facility has wide bays for large machinery and builds, an upgraded electrical system, and provides warehouse and docking space to make their work more efficient, and hassle free – and they can pass these savings on to their valued customers.

They have also updated their facilities to provide a better environment for their employees, encouraging collaborative problem solving, and development across disciplines and increasing productivity as well as employee satisfaction.

They are extremely excited about the new opportunities for continual expansion and growth that these new facilities provide.

Source

Related Articles



Editor’s Pick: Featured Article

Weidmüller’s u-control 2000: The Automation Controller

Weidmüller’s u-control 2000: The Automation Controller

Weidmüller’s scalable engineering software, u-control 2000, adapts individually to your requirements. And, the u-control is powerful, compact and fully compatible with Weidmüller’s I/O system u-remote. This article looks at what makes u-control the heart of your automation.

Programmable logic controllers (PLCs) are one of the main components of any automated system. A typical control system has inputs, outputs, controllers (i.e., PLCs), and some type of human interaction with the system, a human machine interface (HMI), for example.

Read More



Latest Articles

  • Why Use Low-Consumption Contactors in Your Motor Control Systems?

    April 15, 2025 By Tiffany Moore Organizations are under more pressure than ever to improve sustainability metrics. How can you help them succeed — and win more business in the process?    Building motor control systems with more sustainable parts is one piece of the puzzle. Control panel builders, system integrators, and design firms have an… Read More…

  • The Long Cable Run Dilemma: Where Should You Install the VFD?

    April 15, 2025 By Damien Herwegh Sophia, a dedicated electrical engineer in a large industrial complex, has been tasked with installing a drive system where the motor is located hundreds of meters away from the control room. Like many engineers before her, she considers the usual question: Should I place the drive in the electrical… Read More…