Join SEW-Eurodrive at ADM Montréal November 9-10, 2022

DCS Join SEW Eurodrive at ADM in Montreal 1 400x275

October 14, 2022

 

SEW-Eurodrive Company of Canada Inc. is a supplier of choice among Canadian companies from pulp and paper to mining, food and beverage processing, and manufacturing. This outstanding success is based on the company’s ability to offer rugged, reliable drive products backed by an infrastructure that offers extensive support for SEW customers from coast to coast. 

They are thrilled to announce that they will be participating at The ADM Montréal live event and would like to invite you to the show.  

ADM Montréal brings together five advanced manufacturing areas — Design & Manufacturing, Automation Technology Expo, PACKEX, EXPOPLAST, and Powder & Bulk Solids.

This all-in-one, industry-wide event lets you explore the latest trends and technologies shaping the future in advanced design and manufacturing across automation, robotics, energy efficiency, packaging, plastics, processing and more to accelerate your business goals and grow your career.

SEW looks forward to seeing you this November! Register here

 

Show Features:

200+ Supplier Exhibition

Top-name suppliers in packaging, plastics, automation, robotics, and processing technology will be ready to solve your toughest challenges, including PLEXPACK Corporation, VC999, FANUC, Absolute Haitian, Hatch, and more. Access expert-led sessions focused on plastics, automation, processing, packaging, and manufacturing on the show floor, Included in your free expo pass. This is your opportunity to learn about the latest innovations and solutions during live demos presented by exhibitors. Ask questions and get expert insights.

Product Showcase

Don’t miss the New Product Showcase where more than 12 companies will host 15-minute live demonstrations at their booths, offering a close examination of new and improved solutions for your applications.

Download the mobile app by searching ADM Montréal in the app store for the most up-to-date companies, booth numbers, schedule, and more.

Centre Stage

Attend panel discussions and expert-led educational sessions to deepen your industry knowledge and bring you up to date on the latest industry trends. Topics include Plastics Recycling, Packaging and Sustainability, Robotics and Food, and Dust Management.

Networking & Receptions

Join us at the Welcome Reception on Wednesday; then network with like-minded engineers, designers, and decision makers on the show floor during our Booth Crawl on Wednesday and Thursday.

 

DOWNLOAD THE EVENT APP! SEARCH FOR ADM Montréal 2022

SEW EURODRIVE Logo 300x150

 

 

 

 

Related Articles



Editor’s Pick: Featured Article

Weidmüller’s u-control 2000: The Automation Controller

Weidmüller’s u-control 2000: The Automation Controller

Weidmüller’s scalable engineering software, u-control 2000, adapts individually to your requirements. And, the u-control is powerful, compact and fully compatible with Weidmüller’s I/O system u-remote. This article looks at what makes u-control the heart of your automation.

Programmable logic controllers (PLCs) are one of the main components of any automated system. A typical control system has inputs, outputs, controllers (i.e., PLCs), and some type of human interaction with the system, a human machine interface (HMI), for example.

Read More



Latest Articles

  • Why Use Low-Consumption Contactors in Your Motor Control Systems?

    April 15, 2025 By Tiffany Moore Organizations are under more pressure than ever to improve sustainability metrics. How can you help them succeed — and win more business in the process?    Building motor control systems with more sustainable parts is one piece of the puzzle. Control panel builders, system integrators, and design firms have an… Read More…

  • The Long Cable Run Dilemma: Where Should You Install the VFD?

    April 15, 2025 By Damien Herwegh Sophia, a dedicated electrical engineer in a large industrial complex, has been tasked with installing a drive system where the motor is located hundreds of meters away from the control room. Like many engineers before her, she considers the usual question: Should I place the drive in the electrical… Read More…